The new office with industrial building for FoodeQ is a representative eye-catcher with lots of glass! Commissioned by Bouwbedrijf Vrolijk, we produced and assembled the steel construction of approximately 111,500 kg for this project.
Project data
- Industrial building FoodeQ at Steenbergen
-
Realization:2019
-
In assignment of:Bouwbedrijf Vrolijk
-
Weight in steel:111.500 kg
-
Photograph:FoodeQ
Forces of the Reijrink team:
Perry
Thomas